Mirror Mosque
Süre :
Unit / Directorate : Directorate of Public works and Engineering
Start Date : 21 July 2025
End Date : 16 June 2026
Within the scope of the project, the main prayer area of the mosque is 110 m² and has a capacity of 143 people. The last congregation area is 22 m² and is planned to serve 32 people. The women's section is built on an area of 50 m² and has a capacity of 65 people. The imam's room is arranged in a size of 10 m². Based on these areas, the total capacity of the mosque is 240 people. The total construction area of the building is designed as 240 m². The project also includes a 35 m² ablution fountain, a 30 m² multi-purpose hall, and an 80 m² imam's residence.